
SCRAPPER’S STRIPE AFGHAN
(knit)
printer-friendly version
Skill
level: 
Size:
approx. 44" wide x 50“ long (after blocking)
Note: Afghan can be made
longer by adding more color stripes but additional yarn quantities
will be needed.
Materials:
Worsted wt. yarn:
Two skeins (approx. 200 yds.
per skein) main color (MC) for border
Approx. 90 yds. each of 9
assorted colors (CC) for stripes
Sample afghan shown in
assorted colors of Red Heart “Super Saver” (100% acrylic, approx.
160 yds/146 m per 3 oz/85g skein) in black
(border) and various shades of blue, green, gray, mauve and purple
(color stripes)
29”
length circular knitting needle size 10.5 (6.5 mm), or size needed
to achieve gauge
Row
counter (optional)
Tapestry needle
Gauge:
14 sts & 20 rows = 4" in stockinette stitch on size 10.5 (6.5 mm)
needles
One color stripe = approx. 5” high
Stitches/Terms: beginning (beg), bind off (BO), cast on (CO), knit
(k), knit 2 together (k2tog), pass slipped stitch over (psso),
pattern (patt), purl (p), remaining (rem), repeat (rep), slip (sl),
stitch (st), stockinette stitch (st st), yarn over (yo)
Pattern notes:
Afghan
is worked in one piece from lower edge to top.
Nine
stitches at each edge are maintained in seed stitch in MC for
self-border throughout.
Color
stripes consist of 24 rows of an alternating lace pattern. Colors
are changed every 24 rows. After changing to new CC color, cut old
CC color, leaving 6” tail for weaving in later.
Work
with separate balls of yarn for each color section across row. Be
sure to drop old color over new color and pick up new color from
under dropped strand to avoid holes in work.
A row
counter is useful for keeping track of rows in pattern.
Special stitches:
Seed
stitch (on an uneven number of sts):
Row 1: *K1, p1, rep from *
across to last st, k1.
Row 2 and all remaining
rows: Knit the purl sts and purl the knit stitches as they face you.
Notes on lace stitch
pattern: The
stitch pattern consists of an 8-row repeat which offsets every 8
rows. Because each color stripe takes 24 rows to complete, alternate
stripes will follow different row sequences.
Lace Pattern I:
Row 1
(RS): With MC, seed st 9, drop MC, pick up CC, k1, *yo, sl 1, k2tog,
psso, yo, k3, rep from * to last 4 sts before seed st border, yo, sl
1, k2tog, psso, yo, k1, drop CC, pick up MC, seed st 9.
Row 2
(WS): With MC, seed st 9, drop MC, pick up CC, p to last 9 sts, drop
CC, pick up MC, seed st 9.
Rows
3-8: Rep Rows 1-2.
Row 9
(offset row): With MC, seed st 9, drop MC, pick up CC, k4, *yo, sl
1, k2tog, psso, yo, k3; rep from * to last st before seed st border,
k1, drop CC, pick up MC, seed st 9.
Row
10: With MC, seed st 9, drop MC, pick up CC, p to last 9 sts, drop
CC, pick up MC, seed st 9.
Rows
11-16: Rep Rows 9-10.
Rows
17-24: Rep Rows 1-8. At end of Row 24, one CC color stripe has been
completed.
Lace Pattern II:
Row 1
(RS): With MC, seed st 9, drop MC, pick up CC, k4, *yo, sl 1, k2tog,
psso, yo, k3; rep from * to last st before seed st border, k1, drop
CC, pick up MC, seed st 9.
Row 2
(WS): With MC, seed st 9, drop MC, pick up CC, p to last 9 sts, drop
CC, pick up MC, seed st 9.
Rows
3-8: Rep Rows 1-2.
Row 9
(offset row): With MC, seed st 9, drop MC, pick up CC, k1, *yo, sl
1, k2tog, psso, yo, k3, rep from * to last 4 sts before seed st
border, yo, sl 1, k2tog, psso, yo, k1, drop CC, pick up MC, seed st
9.
Row 10
(WS): With MC, seed st 9, drop MC, pick up CC, p to last 9 sts, drop
CC, pick up MC, seed st 9.
Rows
11-16: Rep Rows 9-10.
Rows
17-24: Rep Rows 1-8.
At end
of Row 24, one CC color stripe has been completed.
Afghan
With
MC, CO 143.
Work
in seed st for 8 rows.
Begin
set-up rows (Note: use separate balls of yarn for each color
section. Drop and pick up colors as needed but do not cut them until
instructed to do so):
Set-up
Row 1 (RS): With MC, seed st 9, drop MC but do not cut it, join
first contrast color (CC), k to last 9 sts, drop CC but do not cut
it, join second ball of MC, seed st 9.
Set-up
Row 2 (WS): With MC, seed st 9, drop MC, pick up CC, p to last 9 sts,
drop CC, pick up MC, seed st 9.
Work
afghan in color stripe and lace pattern sequence as follows:
Color stripe 1: work in
Lace Pattern I
Color stripe 2: work in
Lace Pattern II
Color stripe 3: work in
Lace Pattern I
Color stripe 4: work in
Lace Pattern II
Color stripe 5: work in
Lace Pattern I
Color stripe 6: work in
Lace Pattern II
Color stripe 7: work in
Lace Pattern I
Color stripe 8: work in
Lace Pattern II
Color stripe 9: work in
Lace Pattern I
When 9
CC color stripes have been completed, finish afghan as follows:
Prep
Row 1 (RS): With MC, seed st 9, drop MC, pick up CC, k to last 9 sts,
drop CC, pick up MC, seed st 9.
Prep
Row 2 (WS): With MC, seed st 9, drop MC, pick up CC, p to last 9 sts,
drop CC, pick up MC, seed st 9.
Upper
border:
Row 1
(RS): With MC, seed st across all sts, dropping and cutting CC and
second ball of MC, leaving 6” tails for weaving in later.
Rows
2-8: Work in seed st.
BO in
patt and weave in all tails.
Finishing: Following care instructions on yarn ball band, lightly
block afghan to finished measurements.
Variations:
Work
center lace panel in one solid color using a contrast color for
border.
Work
entire afghan in one color using either a solid or multicolor or
self-striping yarn.
Copyright 2011 – Designs by KN –
www.designsbykn.com
For
personal or charity use only. Do not duplicate pattern for
commercial purposes.
|